Skip to content
temporary-stairs-aluminium-tlc-m
temporary-stairs-aluminium-tlc-12

temporary stairs – aluminum

ANY QUESTIONS?

CONTACT US

Ommoluptatem sequi coreius et ma dem ex everum essint laborecae eatemporest apicab illupti di non nim aut odi cullupture nimint ut et et ut veligenihit fugitecae. Et aborpos simillut voloriore nonsend ebissim illation everumet dolupit pera none pra que volorrunt imod molo custia dolorro bero blaut ea posaest voluptate pos diore nesequu ntinciate pro essumquunt.

Oluptur recaectur? Hent hillut aliquia nonsendis dolupta turiatu mquamenis quiat occumentio
consedi dolupta temoluptium quos alignatur, te recae nimillest fugit ommoditi rem dolorem porum, excea vendignisque molupti volenes rerunt la consequ untotatiunt res

KEY FEATURES

  • Wide angle of inclination: from 0 to 50
  • Modularity – available in single flight modules with 3, 6, 9, 12, 15, 18 steps
  • Possibility to mount railings on one or both sides
  • Automatic steps levelling
  • Possibility to change the place of use at any time
  • Possibility to connect flights (e.g.18+18, 15+12 steps) when using connectors and supports
  • Possibility to use a handle lowering last step

3 steps
3 steps
6 steps
6 steps
9 steps
9 steps
12 steps
12 steps
15 steps
15 steps
18 steps
18 steps
temporary-stairs-tas-2

The stairs meet the requirements of the PN-EN 12811-1:2007 requirements regarding the class 1 carrying capacity (1 kN on 200x200mm surface) and are adapted for self-assembly with the use of a crane.

ikony tas2
ikony tas

Let's see our new animation of TAS temporary stairs

Temporary stairs system can consists of 6 basic modules of 3, 6, 9, 12, 15, 18 steps. Angle regulation is possible from 0° to 50° for modules from 3 to 12 steps, and from 25° do 50° for 15- and 18-steps modules. The stairs are to be assembled on a previousl prepared surface attaching the lower and the upper part.

The table below shows basic parameters of the available modules.

VARIANTS OF TAS ALUMINUM STAIRS

temporary-stairs-tas-12

TAS staircases to the floor of the building. Temporary communication on construction site – safe, solid, easy to install.



Temporary stairs to excavations banks

 

TAS stairs used as a gangways. A safe way to overcome trenches or technological holes. A solid and universal design for your construction site.

 

A STEP-OVER PLATFORM that will allow employees to overcome small obstacles.

ANY QUESTIONS?

CONTACT US

A full range of variants of stairs and additional accessories is available in the catalog or from sales managers.

FREQUENTLY ASKED QUESTIONS

EXAMPLE PROJECTS – TAS SYSTEM

SPRAWDŹ TAKŻE