A NEW OFFICE BLOCK. MIDPOINT71, IS BEING BUILT IN WROCŁAW, THE INVESTMENT AREA IS SECURED BY OUR TEMPORARY FENCES

In November 2019, construction works over a 14-storey high building have begun with our temporary SMART hoarding and MOBILT mesh fences, as well as CITY guardrails.

Temporary panels made by TLC are a great solution for this type of investments thanks to a wide range of possibilities. SMART hoarding fences will reduce the construction site impact on the surrounding environment (dust, noise), and screen the construction site. MOBILT mesh fences are the most commonly chosen product from our fencing offer thanks to wide range of variants – they are also perfect for any construction site conditions. CITY temporary barriers are great for determining pedestrian routes or enclosing dangerous areas.

Echo Investments as the developer claims, that the building will be ready by September 2021. The building area or MidPoint71 is 37 thousand square meters, with the parking lot for 423 cars.